Pluvitec Master Blocks - Success case: SAMAE - Brusque/SC
31 de janeiro de 2025Carried out throughout 2024, the renovation of the six filters at ETA Central, in Br [...]
08 ago 2024
By: Hidrol Team
Posted on:
Carried out throughout 2024, the renovation of the six filters at ETA Central, in Br [...]
The renovation of ETA João Jabour, in Salto/SP, included Blocos e Crepinas Pluvitec [...]
The renovation of CEDAE’s water treatment plants in Macaé/RJ was carried out using P [...]